FILE NOTES FOR MEETING ON
SECURITY &
Date:
Time:
Venue: Business Centre Room, Pan-Pacific Hotel
Attendance lr .H.S.Liao President, GCHA
Mr.David Ting Chairman, Security & Safety, GCHA
En.Azlan lsmail Property Manager, GCHA
Mr. Baskaran Group 4 Falck Sdn.Bhd
Mr. Chua Group 4 Falck Sdn.Bhd
En.Hamidon Group 4 Falck Sdn.Bhd
Major Subramaniam Group 4 Falck Sdn.Bhd
The following notes were recorded:-
1.0 GCHA commented that Group 4’s reply to the Letters of Complaints issued by GCHA
Security & Safety Committee is not acceptable. The reply did not address the complaints
and offer remedial measures.
1.1 Group 4 said that, they have appointed Major Subra to be responsible for the operation
and will thereafter be responsible for the satisfactory performance of the security
operation in
1.2
Major Subra said he require sometime to study
the security system in
1.3 GCHA Committee commented they are satisfied with the commitment given by
management level of Group 4 and look forward to the same commitment by the security
guards on duty in
1.4 A lenghtly deliberation on the implementation of Construction Workers Passes was
carried out. Issuance of Construction Workers Passes were not properly carried out by
Group 4 and only 30% of the workers have permanent passes. Group 4 will monitor this
matter closely. To speed up the registration of
Construction Passes, a meeting with
Contractors will be held on
Glenmarie Golf & Country Club.
1.5 GCHA sub-committee apologized for not recording the satisfactory reponse to a mimic
call made on
that:-
i) The Supervisor, Mr.Simon and another guard on patrol responded to the call
within 2 minutes.
ii) He was instructed to call for the guard dogs on patrol and the response was:-
a) Guard dogs with dog handler responded within 2 minutes.
b) 3rd guard dog and dog handler responded within 7 minutes.
1.6 In order to monitor the performance of the security guards on duty in the guardhouse,
Group 4 proposed to install CCTV at the entry and exit point to the guardhouse and
inside the guardhouse. The cost is approx RM5.000.00 and will be funded by Group 4
and GCHA equally.
1.7
GCHA requested Group 4 to translate the operation procedures from Bahasa
English as they will be posted at the GCHA web-site.
1.8 Group 4 summitted the final proposal of the installation of Electric Photo Beams.
There no other matters discuss, the meeting ended with thanks to all present.
File Notes taken by:
Azlan lsmail lr H.S.Liao
Property Manager, GCHA President, GCHA